4 thoughts on “E Patrika

  1. TableofContents
    DEFINITIONSANDINTERPRETATION ARTICLE1 8
    1.1. DEFINITIONS 8
    1.2. INTERPRETATION 14
    CONCESSION ARTICLE2 16
    2.1. GRANT OF CONCESSION 16
    2.2. CONCESSION PERIOD 16
    2.3. ACCEPTANCEOF CONCESSION 16
    PROJECTSITE&EQUIPMENT ARTICLE3 17
    3.1. HANDOVER OF PROJECTSITE &EQUIPMENT 17
    3.2. RIGHTS,TITLEANDUSEOF THEPROJECTSITE 17
    3.3. PEACEFULPOSSESSION 18
    3.4. APPLICABLEPERMITS 18
    PROJECTENGINEER ARTICLE4 19
    4.1. PROCEDUREFORAPPOINTMENT 19
    4.2. PAYMENTSTOPROJECTENGINEER 19
    4.3. REPLACEMENT OF THEPROJECTENGINEER 19
    CONCESSIONAIRE’S OBLIGATIONS ARTICLE5 21
    5.1. PERFORMANCESECURITY 21
    5.2. FINANCING ARRANGEMENT 21
    5.3. DRAWINGS,TECHNICAL SPECIFICATIONS &DETAILED PROJECTREPORT 21
    5.4. PROJECT IMPLEMENTATION 23
    5.5. OPERATION ANDMAINTENANCE 27
    5.6. PROJECT VEHICLES/EQUIPMENTS 28
    5.7. INDEMNIFICATION AGAINSTACCIDENTS 30
    5.8. INSURANCE 30
    5.9. ENVIRONMENTALCOMPLIANCE 32
    5.10. ASSURED WASTE COLLECTIONQUANTITY 32
    5.11. WEIGHING OF THEWASTE 33
    5.12. DAILYREPORTING 35
    5.13. BIOMEDICALWASTE,HAZARDOUS WASTE 35
    5.14. SMARTSWMSYSTEM&MANAGEMENT INFORMATIONSYSTEM 36
    5.15. SHAREHOLDING 36
    5.16. INDEMNITYBYCONCESSIONAIRE 36
    5.17. IECCAMPAIGN 36
    5.18. GENERAL OBLIGATIONS 37
    5.19. NOBREACHOF OBLIGATIONS 39
    5.20. EXPENSES TOWARDS STATUTORYDEPOSITS ANDCHARGES 39
    5.21. SAFETYDURINGCONSTRUCTION,OPERATION AND MAINTENANCEOFPROJECT FACILITIES 39
    5.22. SPECIALSERVICES INHILLYAREAS

Leave a Reply

Your email address will not be published. Required fields are marked *